Wastewater Degradation Test Report

1. Wastewater Information

The wastewater sample was obtained from an industrial source and submitted for degradation testing using electrochemical oxidation.

The wastewater contains phosphorus-based organic compounds, including methyl phosphate, dimethyl phosphate, and ethyl phosphate. The sample also has a high dissolved salt concentration and a high initial COD, making conventional biological treatment difficult without pre-treatment.

Wastewater Characteristics

Parameter Value / Description
Wastewater source Industrial wastewater
Main organic components Methyl phosphate, dimethyl phosphate, ethyl phosphate
Initial COD >61,000 mg/L
Measured test COD 68,732 mg/L
pH 5.34
Salt content >60,000 mg/L
TOC Not provided
Ammonia nitrogen Not provided
Total nitrogen Not provided
Total phosphorus Not provided
Chloride concentration Not provided
Toxicity Not provided
Treatment target COD ≤21,000 mg/L

The main objective of the test was to determine whether electrochemical oxidation could reduce the COD to below 20,000 mg/L and to compare the treatment efficiency of the laboratory-scale and pilot-scale systems.

2. Treatment Principle

The test used an electrochemical oxidation process with a boron-doped diamond anode as the main oxidation electrode component.

When electrical current is applied to the BDD anode, strong oxidizing species are generated at the anode surface. These species react with dissolved organic compounds in the wastewater and progressively break them down into smaller organic molecules.

With sufficient reaction time, the organic contaminants are further oxidized toward carbon dioxide, water, and inorganic products.

The simplified treatment mechanism is:

Organic contaminants → Intermediate oxidation products → CO₂ + H₂O + inorganic compounds

BDD anodes were selected because of their high oxidation potential and suitability for wastewater containing high concentrations of refractory organic compounds.

3. Experimental Procedure

3.1 Laboratory-Scale Test

A 900 mL wastewater sample was placed in a electrochemical reactor and treated using the EO trial module from Evoaeo.

The electrode module was connected to the power supply, and the operating current was set according to the laboratory test conditions. The wastewater was continuously mixed using a magnetic stirrer to maintain uniform contact between the wastewater and the electrode surface.

Samples were collected at predetermined intervals during treatment.

The following operating parameters were monitored:

  • treatment time;
  • current;
  • voltage;
  • wastewater temperature;
  • pH; and
  • COD.

Treatment was continued until the COD approached the required discharge or pretreatment target.

3.2 Pilot-Scale Test

A pilot-scale electrolytic reactor was used to evaluate the treatment process under larger-volume conditions.

The pilot test conditions were as follows:

Operating Parameter Value
Wastewater volume 72 L
BDD anode area 0.636 m²
Average current 220 A
Pulse frequency 12,000 Hz
Duty cycle 65%
Average voltage 14.5 V
Operating temperature Approximately 55°C

A pulse power supply was used during the pilot test.

The wastewater was circulated or mixed during treatment to maintain consistent contact with the electrode system. Samples were collected at different operating times and analyzed for COD.

4. Observations During Treatment

The untreated wastewater was essentially colorless.

Only a small amount of foam was observed during electrochemical treatment. No significant precipitation was produced during the degradation process.

This indicates that COD reduction was primarily associated with electrochemical oxidation of dissolved organic contaminants rather than contaminant removal through precipitation or solids separation.

The appearance of the wastewater remained relatively stable throughout the test.

5. Test Results

5.1 Laboratory-Scale Test

The initial COD concentration was 67,932 mg/L.

COD decreased progressively as the electrochemical treatment continued.

Treatment Time COD
0 h 68,732 mg/L
10 h 43,715 mg/L
14 h 35,851 mg/L
16 h 26,647 mg/L
18 h 20,885 mg/L

After 18 hours of treatment, COD had decreased from 68,732 mg/L to 20,885 mg/L.

The corresponding COD removal efficiency was approximately 70%

The wastewater was therefore very close to the target COD of 20,000 mg/L after approximately 18 hours of laboratory treatment.

 

6. Laboratory and Pilot Test Comparison

The laboratory and pilot tests both confirmed that the wastewater could be treated by BDD electrochemical oxidation.

The laboratory test reduced COD from 68732 mg/L to approximately 20,885 mg/L after 18 hours.

Based on the project energy-consumption calculation at a comparable COD concentration of approximately 20,000 mg/L, the pilot-scale system required approximately 49.1% of the specific energy consumption of the laboratory-scale system.

On this basis, the calculated energy efficiency of the pilot system was approximately:

2.04 times that of the laboratory-scale test system.

The improvement is mainly associated with the larger electrode configuration, pulse power operation, reactor design, mixing conditions, and improved utilization of the electrode surface.

8. Effect of Temperature

During the pilot test, wastewater temperature was maintained at approximately 50°C to improve consistency between test runs.

Temperature has an important influence on electrochemical treatment.

A moderate increase in wastewater temperature can:

  • improve mass transfer;
  • increase reaction rates;
  • reduce solution resistance;
  • improve electrochemical oxidation efficiency; and
  • shorten the required treatment time.

Higher operating temperatures may therefore improve treatment performance further.

However, evaporation becomes increasingly important as the wastewater temperature increases. For practical industrial operation, the optimum temperature should be determined by balancing degradation efficiency, evaporation loss, electrical consumption, and equipment operating requirements.

9. Test Conclusions

The test confirmed that BDD electrochemical oxidation is technically suitable for treating the high-COD, high-salinity wastewater evaluated in this study.

The raw wastewater had an initial COD concentration of approximately 68,732 mg/L and a salt concentration above 60,000 mg/L.

The main test findings were:

  • The laboratory-scale system reduced COD to approximately 20,885 mg/L after 18 hours, corresponding to approximately 70.1% COD removal.
  • The pilot-scale system reduced COD below the required 20,000 mg/L treatment target.
  • Pilot-scale COD reached 16,520 mg/L after 27 hours.
  • Continued treatment reduced COD to 2,363 mg/L after 35 hours.
  • The maximum demonstrated COD removal during the pilot test was approximately 96.5%.
  • No significant precipitation occurred during treatment, indicating that COD reduction was primarily due to oxidation of dissolved organic contaminants.
  • Based on the project calculation at a comparable COD level, the pilot system used approximately 49.1% of the specific energy required by the laboratory-scale system.
  • The corresponding pilot-scale energy efficiency was approximately 2.04 times higher than the laboratory test system.
  • Maintaining the wastewater temperature at approximately 50°C supported stable electrochemical treatment performance.

The results indicate that electrochemical oxidation can be applied as a pre-treatment or advanced treatment process for high-strength industrial wastewater containing phosphate-based organic compounds.

For full-scale application, operating current density, electrode loading, wastewater temperature, hydraulic mixing, treatment time, and energy consumption should be optimized according to the required outlet COD and the economics of the treatment system.