Supporting tool 1 of 3

EO Feasibility Assessment Tool

Use this structured screening tool after the EO go/no-go checklist. It tests whether the available technical evidence, site economics, compliance need, operational readiness, and execution risks are strong enough to justify the next engineering step. It does not determine treatment suitability on its own.

Select the statement that is supported by the evidence currently available. Do not estimate upward to reflect an expected future condition. Required fields must be completed before a result is produced.

Feasibility dimensions
Treatability and performance evidence for this specific stream.
Site-specific energy, electrode, maintenance, residuals, and alternative-treatment costs.
The documented need, deadline, and consequence of inaction.
Utilities, equalisation, controls, monitoring, maintenance, and competent staffing.
Stream variability, chloride/byproducts, gas evolution, materials compatibility, and monitoring controls.
Use the lowest level that applies across the five dimensions.

Why chemistry alone isn’t enough

Five dimensions, not one

A wastewater stream can appear chemically suitable for electrochemical oxidation and still be a poor project candidate. The treatment target may not justify the energy demand, the site may lack equalisation or electrical capacity, or the stream may carry unresolved chloride and byproduct risks. A defensible feasibility decision therefore needs traceable evidence across all five dimensions, with technical suitability and safety treated as gates rather than points that can be offset by a strong business driver.

What each dimension actually covers

Under the hood

Turning a score into a decision

What to actually do with this result

Read the result in three layers: first, check for any technical or risk gate; second, review the evidence confidence; third, use the overall score to prioritise the next action. A high total cannot compensate for an unresolved treatment-suitability issue, an uncharacterised chloride/byproduct hazard, or a site that cannot safely operate the equipment.

For a feasibility memo, record the selected rating, the evidence supporting it, the evidence date and owner, and the action required to close each gap. The score is a screening aid. Capital approval, permit interpretation, process design, and safety decisions require review by qualified engineering, environmental, operations, and financial personnel as applicable.

Evidence and decision governance

What a decision-ready record should contain

For each rating, retain the source, date, responsible person, method, units, assumptions, and unresolved limitations. Technical claims should be tied to the actual wastewater matrix and treatment target. Economic claims should state tariff, duty cycle, electrode-life, maintenance, residuals-management, and comparison-basis assumptions. Regulatory claims should identify the applicable jurisdiction and be checked against current permits or agency requirements.

Recommended review roles: process or environmental engineer; site operations and maintenance; environmental compliance; electrical and process-safety personnel where relevant; and finance or procurement for lifecycle-cost assumptions. Display the author, technical reviewer, last-reviewed date, and revision history on the published page.

Straight answers

Common questions

Yes, functionally — the technical fit dimension here assumes that screening has already happened. Running this tool first without that context tends to produce an inflated technical fit score.
Not necessarily — look at the distribution across dimensions, not just the sum. A stream scoring evenly across all five is usually a more resilient case than one with a very high score on two dimensions and a very low score on a third.
No — it’s meant to structure the technical and operational case that feeds into whatever capital approval process your organisation already uses, alongside the financial analysis your finance team will run independently.

More questions? Explore  more

Where does this take you next?

Choose the path that matches where you are now, get a better comprehension about electrochemical oxidation wastewater treatment.

→ Yes — EO is a fit

Your contaminant is recalcitrant, your regulatory driver requires destruction, and the matrix is compatible. Move to treatability testing.

→ Not sure yet

You have answered some of the fit questions but not all. Use the Go / No-Go Checklist to work through the remaining decision variables.

→ No — EO is not the right fit

The contaminant is biodegradable, the scale is too large, or the driver does not require destruction. Review the alternatives.